Projects

seam copper roof replacement

BMI Birmingham

The aged copper roof had been stolen from this property and due to this being in a conservation area the same visual effect was required by both the conservation team and the insurers. This was achieved by using a Met seam zinc product that has no re-sale value but has the same visual effect as aged standing seam copper. Project time 4 weeks 600m².

church roofing

Chruch, Handsworth, Birmingham

This Church in Handsworth, Birmingham was in desperate need of a new roof. The copper roof had been stolen and the insurance company required a finish to replicate lead. This was completed using a Sika liquid plastic 20 year system.

Handsworth, Birmingham Roofing Project

Handsworth, Birmingham

This roofing project in Handsworth, Birmingham was a 3 week project. We stripped and re-tiled this detached house, using Marley acme tiles, breathable felt, secret valleys and a dry ridge system. New code 4 lead flashings and gutters to all chimneys. New half round black guttering and downpipe. 

Birmingham slate roof project

Jewellery Quarter, Birmingham

This is a slated roof in the conservation area of the Birmingham Jewellery quarter. The slates were stripped and stacked for re-use. This project included a semicircle of slates. The new build section of the project included grade 1 slates, dry ridge and hip system and new code 4 and 5 leadwork. Project time 12 weeks.

Hampstead roofing project

Netherall Gardens, Hampstead, London

This project was in a Conservation area of Hampstead, London. The roof required replacing due to the condition of the tiles and hips. We replaced the valleys and replaced with code 5 lead, new fascia and all balconys replaced with code 5 lead. Project time 16 weeks.

roofing in Luton

Old Knebworth, Luton | Bedfordshire

This project at Old Knebworth, Luton. This was a renovation project for all roofs. We had to strip and re-tile the roof whilst trying to salvage as many handmade tiles as possible. We had the task of matching the old tiles with the new. We also fitted new GRP valleys and dry ridge system. We also installed 4 Velux skylights to bleed light into the living space.

Roofing in Richmond-upon-Thames

Richmond-Upon-Thames, London

We completed this small project in Richmond-Upon-Thames, South-West London within 1 day. The client had a Flat roof extension which need roofing using Sika Sarnafil single ply. 

Windmill Farm, Walsall

Windmill Farm, Walsall | West Midlands

This Project at Windmill Farm, Walsall consisted of a  new build  of 350 ²m of grade 1 slating including close mitred hips and valleys, GRP valleys, code 5 leadwork around all skylights and abutments. This project took 6 weeks.